Building Plants and Systems  

Centro Torri

The work, divided into two parts between mid 2004 and 2005, involved updating mechanical systems for both air conditioning and heating. The work in the first part involved overhauling the departments and the existing works. The second phase was more extensive and involved replacing the existing boilers with two 450 KW basement boilers as well as the supply and installation of no. 4 26500 m3/h air treatment units and the installation of no. 2 refrigeration units (393 Kw each).

Sample Sample Sample
Sample Sample Sample
Sample Sample Sample
carta servizi